Start by making sure the ground has been prepared well including rototilling the soil, raking the area smooth and then compacting the soil with a half filled water filled roller. Water the soil to help settle it and then repeat the smoothing and rolling. Your grade should be ¾” below any adjacent concrete.

Have your sod delivered in the morning of installation day from your local sod farm.

  1. Water the area to be sodded the day before so that it is moist to a depth of about 6 inches.
  2. Apply 16-16-16 fertilizer (1 pound per 100 sf) on top of your rolled finished grade.
  3. Apply lime at 5-8 pounds per 100 sf.
  4. Install your sod beginning against the longest straight edge and work toward any irregular boundary.
  5. Try not to use small pieces of sod, they won’t take root as well as larger ones.
  6. Fit the pieces together snugly. Stagger pieces so the sod seams don’t line up.
  7. When working around trees or garden areas, use a very sharp knife to cut the sod into shape.
  8. As you install the sod, keep the ground and sod moist with light periodic watering.
  9. Roll the sod with a half full water filled roller to flatten all seams and better help the sod to take root.
  10. Water your new lawn regularly to keep from drying out.
  11. It should be ready for its first mowing in 7-10 days.

Sign Up

Subscribe for our weekly gardening updates and specials at Far West Turf & Nursery.

  • This field is for validation purposes and should be left unchanged.

Custom Menu – Icon Links

Get In Touch

  • This field is for validation purposes and should be left unchanged.

Visit Farwest Turf Farm and Nursery

Address: 35306 Northwest Toenjes Road, Woodland, WA 98674
Contact #: (360) 263-4700

NURSERY HOURS:

As of March 2021
Monday – Saturday 9:00am – 4:00pm
Sunday: CLOSED
(If Sunday is the only days that works for you, appointments are available. Call us to set one up!)

SOD PICKUP HOURS
Monday – Saturday 9:00am – 4:00pm
Sunday: CLOSED